Feasibility First, Drawings Second
Every Brentwood addition starts with arithmetic about the lot. Our estimating desk pulls the zoning designation, the parcel dimensions, and the recorded square footage of the existing house, then calculates how much residential floor area remains. Flat R1 parcels work against the 45 percent limit. Parcels inside the city's mapped Hillside Area work against slope bands, where steeper ground yields less allowable area. Front, side, and rear setbacks fix the buildable footprint. Easements, protected trees, and the reach of the existing foundation narrow it further. We deliver that feasibility read before you commission a full architectural set, so the design begins inside the envelope the city will approve. When the numbers refuse the addition you had in mind, we say so early and show you what the lot will carry.