New Homes

    Custom Home Builder in Malibu

    Build And Decor Construction builds custom homes from the ground up in Malibu. I am Sebastian Moreno Rivera, the owner, and you deal with me directly from the first site walk to the certificate of occupancy. The license, CSLB #1113888 (Class B General Building and C-33 Painting and Decorating), is held by the corporation, Build And Decor Construction, and I am its qualifying individual on the State record.

    Malibu is its own city with its own coastal rules. A new home here is approved by the City of Malibu in two steps, planning first and building second, and the lot decides how long the first step takes.

    Two approvals, in order

    Planning. The City's Planning Division reviews the house against Malibu's zoning and its Local Coastal Program. For a new single-family home that review typically runs as a Coastal Development Permit, often with companion requests: Site Plan Review for height above 18 feet, a minor modification for a setback, or neighborhood standards for size. Planning approval ends with a green stamp on the plans.

    Building Safety. With the green stamp, the project moves to plan check in the Building Safety Division of the Community Development Department, through the City's online Development Portal. The City routes the drawings to its internal reviewers. Outside agencies are the applicant's job, and the City names them: the Los Angeles County Fire Department and Los Angeles County Water District 29 among them. I manage those submittals with your design team so the building permit is not waiting on a letter nobody requested.

    One rule shapes every Malibu schedule. A Coastal Development Permit does not take effect until all appeals, including appeals to the California Coastal Commission, are resolved, and it expires if construction has not started within three years of final City action unless it is extended for due cause.

    What the site asks of the design

    The City states that all of Malibu lies in a Very High Fire Hazard Severity Zone. That designation belongs in the first conversation with your architect, not the last, because it shapes materials, openings, and site work around the house.

    Where a lot runs on an onsite wastewater treatment system, the system is part of the approval: the City lists it in the coastal permit for a new home alongside the house, the grading, and the retaining walls. Its condition and capacity are questions to answer before the floor plan is fixed. Bluff, slope, and soils conditions bring a geotechnical engineer in at the start rather than at plan check.

    Access is the last site question and often the hardest. The Los Angeles County Fire Department reviews vehicular access and water pressure, and a narrow canyon road decides how materials arrive. I plan deliveries and staging before the first truck is booked.

    How a Malibu build runs with me

    1. Jurisdiction and lot facts. I confirm the parcel sits inside City limits, then pull its zoning, coastal status, permit history, and utility situation before we meet on site.

    2. Design team. Your architect designs the house; your structural, civil, and geotechnical engineers design what carries it. I review the drawings for buildability, sequencing, and access while they are still drawings.

    3. Planning, then Building Safety. I work the corrections with your team through both steps and keep the outside agency letters moving in parallel. I never promise approval dates, because the City and the Coastal Commission set them.

    4. Written scope and agreement. You approve the scope and the agreement before work starts, with each payment stage tied to a milestone you can verify on site.

    5. Build and inspections. Foundation, frame, envelope, systems, finishes, each with its City inspection. You get site photos as the work moves, and any condition that changes the scope reaches you in writing the day I find it.

    6. Final and handover. After final inspection we walk the house together, close the punch list, and I hand over the documents for everything we built.

    Investment

    A Malibu home is priced by its foundation, its site, its access, and its finishes, never by a number pulled from a chart. I put a written figure on a defined scope after the site walk and the plan review. Tell me the budget range you plan in the build request, and I will tell you early whether the design and the budget agree.